Nangal

National Fertilizers Limited,
Naya Nangal
,Punjab-140126
Tel :01887-220543
Fax :01887-220541
Email : This e-mail address is being protected from spambots. You need JavaScript enabled to view it






About City

Nangal is situated at a distance of 100 kms from Chandigarh – the joint capital of Punjab and Haryana. It has a township at a stone’s throw from a fertilizer unit often referred to as Nangal Unit of National Fertilizers Limited. Places of religious importance like Shri Anandpur Sahib, Mata Naina Devi Shrine, Shri Bhabour Sahib lie within 20 kms radius of Naya Nangal. Places of tourist attraction like Manali and Dharamshala in Himachal Pradesh can also be visited en-route a trip to Naya Nangal. A rail head connection to ‘Nangal Dam’ station is on the electrified track with two daily trains to national capital Delhi.

Soon after independence of our country the need to develop the infrastructure in the country was hard felt. As a result of the motivation by the policy makers of the nation at that time, sites and locations were shortlisted on priority basis for hydro projects, core sector industry, research and development, defence establishments etc. In an endeavour towards this, a small village nestled in the midst of Shivalik Hills on the banks of the river Sutlej was considered to be an ideal location for a Hydro power project. This idea mooted by a foreigner and proposed to the then Prime Minister gave birth to Bhakra Dam – often referred to as one of the ‘temples of modern India’. The artificial lake created upstream of the dam christened ‘Gobind Sagar’ is still considered as the biggest man-made lake in the world. With the coming up of Bhakra Dam and surplus power available from the hydel project, Govt. of India decided to set up Fertilizer Factory at Naya Nangal, which went on stream in 1961.

About NFL Plant

Consequent upon the reorganization of FCI group of plants, Nangal Plant was  transferred to NFL & subsequently expansion plant of Nangal Unit was commissioned with an installed capacity of 3.30 LMT. Further in order to sustain and enhance the company’s growth, NFL successfully revamped Urea Plant of the Nangal Unit & Commercial Production was commissioned after revamp w.e.f. 1st Feb 2001 thus enhances the Annual installed Capacity from 3.30 LMT to 4.785 LMT .  As per guidelines of GOI, in order to reduce subsidy burden & Carbon footprint, NFL revamped the Nangal Unit on LSTK basis for changeover of Feedstock from LSHS/FO to Natural Gas and commercial production on Gas was commenced during April 2013. 

SALIENT FEATURES OF NANGAL UNIT

Installed Capacity: 478500 MTPA
Capital Investment:

229.19 Crores

Commencement of Production: November 1, 1978

Process

Ammonia: KBR SMR(Steam Methane Reforming) with Purifier Technology
Urea: Technimont Total Recycle Process
Raw material: Coal , LNG/ RLNG, Power, Water





 

What's New

SignNFL profit jumps 66% in first quarter (Q1) 

SignUnaudited Financial Results for the quarter ended 30.06.2018 

SignPress Release : NFL wins Best PSU Award 

SignPress Release : NFL bags award for use of Official Language (Hindi) 

SignPress Release : NFL sponsored Para athletes win 6 medals in National Championship 

SignNotice and Newspaper cutting : Board Meeting on 03.08.2018 

SignNotice : Closure of Trading Window - 16.07.2018 

SignPress release : NFL signed MoU with Deptt. of Fertilizers for the year 2018-19 

SignPress release : NFL bags Hindustan PSU Award 2018 

SignInvestor Presentation Q4(2017-2018) 

SignSwachh Bharat Summer Internship. 

SignMedia Coverage of Annual Financial Results 2017-2018 

SignPress Release - NFL Records net profit of Rs. 212 crore during 2017-2018 

SignNOTICE FOR OFFICE SPACE FOR STATE OFFICE H.P. AT SHIMLA ON RENTAL BASIS & PRESS RELEASE 

SignAudited Annual Financial Results for the Financial year 2017-18 

SignPress Release - NFL Contributes towards Armed Forces Flag Day Fund under CSR 

SignNotice - Board Meeting - 02.05.2018 

SignNotice - Closure of Trading Window - 09.04.2018 

SignNFL has achieved highest ever production of Urea in 2017-18 

SignNFL awarded Prize for House Journal by PRCI 

SignFINANCIAL PERFORMANCE FOR THE 3rd QUARTER ENDED 31.12.2017 

SignDirector (Finance), NFL received "CA Distinguished Achiever Award" 

SignNFL records profit of ₹231 crore up to 3rd Quarter (2017-18) 

SignRepublic Day Celebrations at NFL 

SignUnaudited Financial Results for the quarter ended 31.12.2017. & Press Release

SignAppreciation Letter on CSR Activities  

SignPress Release : NFL sponsored Para Players make India proud  

SignPress Release regarding Energy Conservation Award by Honble President 

SignDigital Payment Mission : National Fertilizer Limited 

SignShri Manoj Mishra C&MD, NFL elected to the Board of International Fertilizer Association (IFA) 

SignFinalizing Road Map for redefining role and functions of CPSEs- New India 2022 (Presentation) and (Agenda)